Wooden houses over 70 m²

House CLT1 – WT 2021 – 54 m²

DREWNOLANDIA XS House - WT 2021

House CLT2 - WT 2021 – 70 m²

CLT3 House – WT2021 – 50 m² + Loft

DREWNOLANDIA V1 House - WT 2021 – 70 m²

CLT4 House ~100 m²

DREWNOLANDIA V2 House - WT 2021

DREWNOLANDIA V3 House - WT 2021

DREWNOLANDIA V4 House - WT 2021

DREWNOLANDIA V5 House - WT 2021

CLT5 House ~100 m²
Home over 70 m² under the notification scheme – save time and costs
Using the current Building Law regulations (as of March 2026), we offer projects that let you enjoy spaces exceeding 70, 80, or even 90 m² of usable area, while keeping a simplified formal path. By choosing a home above 70 m² without a permit from our range, you opt fora proven timber-frame technology and energy efficiency.
Building under the notification system is, above all, a real time saver. Instead of waiting months for the building permit decision to become final,you can start the works almost immediately after completing simple formalities at the office. This is the perfect solution for those who want to move into their own home even this season.
Choosing a 70 m² building without a permit (or larger) gives you:
Maximum usable space – by using a usable attic or mezzanine, the real space can reach 90–100 m². This is more than enough for a family of 2+2.
Guarantee of solidity – our homes, such as the Drewnolandia V5 Premium model, fully comply with the stringent WT2021 standards. This means excellent thermal insulation, low heating costs and year‑round comfort.
Speed of execution – production of components in controlled indoor facilities eliminates workmanship errors and reduces on-site assembly time to a fraction of that required for masonry technology.
Expert support at every stage of building your future home
Deciding on a home above 70 m² without a permit in Drewnolandia doesn’t leave you alone with the paperwork. Each Client has an assigned advisor who supports adapting the project to the plot requirements and helps with filing the notification documents. The standard offer includes:
transport and assembly nationwide,
anchoring the structure to the foundation and full window and door joinery,
safety systems: factory‑installed CCTV camera dummy for property protection from day one of construction,
guarantee of fixed price: the cost agreed in the contract remains binding regardless of fluctuations in raw material prices on the market.
Have questions or want to tailor a chosen project to your needs? Contact us! We’ll guide you through the entire process – from selecting a project and its adaptation, to handover of the keys to the building.
Frequently asked questions about homes over 70 m² without a permit (FAQ)
Below you’ll find a collection of essential information about building homes under the simplified procedure.
Is it possible to build a home over 70 m² without a permit?
Yes, current Building Law regulations (as of 2026) allow the construction of detached, no more than two‑storey single‑family residential buildings with a built‑up area above 70 m² under a notification with a building project.
What conditions must a permit‑free home above 70 m² meet?
To use the notification procedure, the building must be detached and have no more than two storeys.
What formalities must be fulfilled when building a home without a permit?
You need to file a notification of construction with the appropriate county starostwo or city hall. The notification must include, among other things, a plot or site development plan, architectural‑construction project, a declaration of the right to dispose of the property for construction purposes, and a declaration that the investment serves the owner’s housing needs. It is also necessary to inform the building supervision authorities about the start date of works.
How does a notification differ from a building permit?
A building permit is an administrative decision that authorities have up to 65 days to issue (and in practice often longer). A notification for a home over 70 m² starts the notification procedure with the project, where a lack of objection within 21 days constitutes the so‑called “silent consent.”
Can a mezzanine be used in a home above 70 m² without a permit?
Yes, a mezzanine is permitted and is an excellent way to increase usable space without changing the building parameters. However, remember that, by definition, a mezzanine is not treated as a separate storey if it is inside the room and not separated by building partitions from the space it is enclosed within.
How long does it take to build a home without a permit above 70 m²?
Drewnolandia technology enables quick project completion – on‑site assembly to developer finish usually takes from a few to several weeks. Additionally, thanks to the notification procedure, the preparatory phase is shortened by at least 2–3 months compared with the traditional building permit route.

